- ICS / SCADA Industrial Systems

Industrial Systems Can't,
Afford Any Downtime for Testing.

We assess industrial control and SCADA environments with the caution they require, identifying risk to operational technology without disrupting the live processes your business depends on.

What We Test
- Industries We Serve

ICS/SCADA Industrial Systems Testing Built Around Your Sector

Operational technology carries risks that standard IT testing doesn’t cover, and the physical and facility systems behind most industries rarely get the scrutiny their office networks do.

We scope every assessment around safety and uptime first, adapting our approach to the specific operational systems your sector depends on to keep running.

Finance

We assess physical security and building-management ICS environments that support finance sector facilities.

Healthcare

We assess building and facility control systems tied to healthcare sites, protecting operational continuity.

Legal

We assess facility and physical access control systems that protect legal sector premises and archives.

Retail & E-Commerce

We assess warehouse and logistics automation systems that keep fulfillment and supply chains running.

- Why AWJ Tech

What Our Industrial Systems Testing Delivers

An ICS/SCADA assessment from AWJ Tech is built around the realities of operational environments.

01

Safety-First Methodology

We use passive analysis and controlled testing techniques designed to avoid disrupting live operations.

02

IT/OT Segmentation Review

We verify whether your operational network is genuinely isolated from your corporate IT network.

03

HMI and Access Control Testing

We assess human-machine interfaces for weak authentication and unauthorized access paths.

04

Legacy Protocol Awareness

We assess older industrial protocols with the specific risks they carry in mind.

05

Remote Access Review

We test how vendors and staff remotely access industrial systems, a common entry point for attackers.

06

Non-Disruptive Testing Windows

Testing is scheduled around your operational calendar to avoid production impact.

07

Retest Included

We confirm remediated configurations hold up without introducing new operational risk.

08

Compliance-Ready Evidence

Reports are structured to support ISO 27001 and internal operational risk requirements.

09

Operations-Aware Reporting

Findings are written with both your security and operations teams in mind.

A Breach on the Factory Floor Isn't
Just a Data Problem.

AWJ Tech Tests Industrial Systems Without Stopping Them

Industrial environments face the same attackers as IT networks, but downtime for testing usually isn’t an option. AWJ Tech uses assessment techniques built for operational environments, so testing doesn’t become the disruption you were trying to prevent.
- Why Do Businesses Trust AWJ Tech?

The Credentials Behind Every Promise We Make

- How We Approach Industrial Testing

From Safety Briefing to Signed-Off Report

Six stages take your industrial environment from scoping to a confirmed, safely closed finding.
Stage 1

Scoping and Rules of Engagement

We agree on in-scope systems, safety constraints, and approved testing windows with your operations team.

Week 0

Stage 2

Reconnaissance and Mapping

We map network architecture and segmentation between IT and OT environments before any testing begins.

Days 1–2

Stage 3

Controlled Testing and Analysis

We use passive analysis and carefully controlled techniques appropriate for live industrial systems.

Days 3–7

Stage 4

Impact Analysis

Findings are rated by both security risk and potential operational impact.

Day 8

Stage 5

Reporting and Walkthrough

You receive a report and walkthrough covering both security and operations stakeholders.

Days 9–10

Stage 6

Retest and Sign-Off

We retest after remediation to confirm findings are closed without introducing new operational risk.

Within 90 days

- Client Reviews

What Clients Say About Our
Industrial Systems Testing Service

Stephen Stanton (COO)
★★★★★
A Public Listed Investment Bank (UAE)
"An effective business partner! Throughout our rapid business growth, we were ensured world-class security services despite budget and schedule constraints. Anticipated issues well in advance and provided timely recommendations...."
Vijay C. (Head of IT)
★★★★★
A Major Airlines Company | UAE
"Proactive and well liked by our staff due to their 'can do' attitude. When faced with problems, proactively suggested solutions. Took actions and decisions as appropriate to the business."
Ian Anderson (CTO)
★★★★★
A Top 5 Financial Institution | Australia
"I have had the privilege of working with Sadiq. He possesses expert security skills, broad and deep industry knowledge and in-depth understanding of regulatory requirements within the finance industry…”
Andre Herbst (Director Growth & Partnerships)
★★★★★
A Leading Business | Australia
"A rare breed of folks who are able to hold both deep technical and cyber conversations whilst combining and communicating the business context that helps bridge the gap for all involved."
- Common questions

What Clients Ask About
Industrial Systems Testing

No. We use safety-first, non-disruptive techniques and schedule testing windows around your operational calendar.
Where available, we prefer testing in a staging or replica environment; live testing is only done with strict, agreed safeguards.

Yes. We regularly assess legacy PLCs, HMIs, and industrial protocols alongside modern equipment.

In most cases, yes, for a thorough assessment of network segmentation and physical access controls.
Safety-critical systems are identified during scoping and either excluded or tested with extra safeguards agreed with your team.
Most engagements take two to four weeks, depending on facility size and the number of systems in scope.
- Get In Touch

Let's Talk About Your Industrial Systems

If your business depends on operational technology that can’t afford downtime, our engineers are ready to scope a careful assessment. Reach out for a straight answer about what needs testing.

Office 55, Al Khaimah Building Port Saeed, Dubai, UAE

Response time

01 Business Day

- Ready When You Are

Talk to a Team That Understands Your Operational Constraints

Most digital testing providers aren’t equipped to work around live industrial processes.

Partner with AWJ Tech and work with engineers who plan around your operational calendar, not the other way around.